Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ns-cloner-site-copier domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/clients/45f02005bbdbf07a7007fab4ec3227c7/sites/gcc-sandbox.com/wp-includes/functions.php on line 6121
Immeuble "Le Digital" - GCC Energie

retour aux réalisations

Immeuble « Le Digital »

Montreuil (93)

Immeuble de bureaux "Le Digital" à Montreuil

Maitrise d'ouvrage

Architecte

Architectes : TOA

Opération en

Construction, par GCC IDF2 pour SNC Digital et Sopic, d’un immeuble de bureaux de R-1 à R+5 totaliant 6 000m².