Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ns-cloner-site-copier domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/clients/45f02005bbdbf07a7007fab4ec3227c7/sites/gcc-sandbox.com/wp-includes/functions.php on line 6121
Gare d'Austerlitz - GCC Energie

retour aux réalisations

Gare d’Austerlitz

Paris (75)

Réhabilitation de la Gare d'Austerlitz par GCC

Maitrise d'ouvrage

Architecte

Architectes : AFA ARCHITECTES

Opération en

Réhabilitation lourde, par GCC TPIN et BTB GES (agence Travaux) , de trois bâtiments historiques et construction d’un batiment neuf, sous la grande halle Voyageurs pour la SNCF.